SNUGLITE-III (2022-)
Mar 1, 2022
SNUGLITE-III CubeSatSeoul National University GNSS Laboratory Satellite (SNUGLITE)-III Project
- 3U+3U CubeSat mission (Launch: Nov 2025)
- Funded by Korea Aerospace Research Institute (KARI)
- Finalist in the 2022 Korea CubeSat Competition
SNUGLITE-III 임무 개념도
System
- 3U+3U Twin CubeSat
- Main payloads:
- L1/L2C GPS receiver x3
- Inter-satellite link module
- Electomagnetic docking device
- Mass: 3.2 kg
- Orbit: SSO 600km (LTAN 12h30m)
Frequency:
- UHF (MHz)
- downlink : beacon, command-return
- uplink : tele-command
- S-band (2405MHz)
- downlink : housekeeping data, mission data